Unlock data center capacity in PJM with on-site battery storage — no upfront capital.
Backed by Macquarie · 1,480 MW / 2,600 MWh developed · $0 CapEx
10×
Capacity-price increase — $28 → $329/MW-day in two years
6.6 GW
Reliability shortfall — first auction failure in PJM history
5–8 yrs
Interconnection queue wait for new front-of-the-meter projects
BYONC
On-site resources qualify under BYONC as a demand-side resource.
RBP (imminent)
Auction failures trigger data-center-funded procurement — up to $15B exposure
CAM (forthcoming)
On-site solutions reduce curtailment obligations
Energy-as-a-Service; Calibrant owns and operates the system.
On-site battery storage addresses interconnection timing, regulatory exposure, and operational reliability.
On-site resources act as the first — and often only — line of defense against load curtailment.
Over 1,480 MW / 2,600 MWh of on-site solar and storage in operation, construction, or exclusive development agreements across the U.S. and Canada.
Brought a 100+ MW data center online despite a four-year utility interconnection backlog
Calibrant moved from engagement to equipment procurement in just six months.
Backed by Macquarie · 1,480 MW / 2,600 MWh developed · $0 CapEx

